Boiler Inspection (10 CEP)
Duration: 9:00 AM - 5:00 PM (2 Days)
Venue: No. 11A & 11B, Jalan Puchong Permai 2, Taman Puchong Permai, 47100 Puchong, Selangor.
HRD Corp Claimable Courses - Skim Bantuan Latihan Khas
Training Program Number: 10001649787
📅 Upcoming sessions- Batch 2: 8 June - 9 June 2026 — Brochure and Training Plan: Click Here (Full)
- Batch 3: 10 September - 11 September 2026 — Brochure and Training Plan: Click Here 19 slots left
Training Outcomes
Upon completion of this training, participants will be equipped to immediately implement best practices and:
- Identify the specific roles and legal responsibilities of Competent Persons (Boilerman and Steam Engineers) during the inspection lifecycle.
- Apply international design codes such as ASME Section I and BS EN 12952/12953 to verify boiler structural integrity.
- Execute a comprehensive pre-inspection preparation plan, including cooling, isolation (LOTO), and confined space safety protocols.
- Determine the most effective Non-Destructive Testing (NDT) methods for detecting subsurface cracks, wall thinning, and weld defects.
- Assess the physical condition of internal boiler components through systematic visual inspection (VT) techniques.
- Manage the documentation and technical requirements for the registration and commissioning of new boiler units.
- Supervise a statutory Hydrostatic Pressure Test while adhering to precise safety and stabilization parameters.
- Prepare the steam plant for a successful Certificate of Fitness (CF) renewal visit by a DOSH Inspector.
- Verify the functionality of critical safety automation, including Low Water Fuel Cut-Off (LWFCO) and high-pressure alarms.
Topic
Codes, Standard For Boiler Inspection, Inspection, Methodology & Preparation, New Boiler Inspection, CF Renewal Inspection (Periodic Inspection), Special Inspection & Major Repair, and Common Boiler Defects & Root Cause.