← Back to all CEP courses
Steam Turbine Operation & Control

Steam Turbine Operation & Control (10 CEP)

Duration: 9:00 AM - 5:00 PM (2 Days)
Venue: No. 11A & 11B, Jalan Puchong Permai 2, Taman Puchong Permai, 47100 Puchong, Selangor.
HRD Corp Claimable Courses - Skim Bantuan Latihan Khas

📅 Upcoming sessions
  • Batch 2: 05 November - 06 November 2026 — Brochure and Training Plan: Click Here 30 slots left

Training Outcomes

Upon completion of this training, participants will be equipped to immediately implement best practices and:

  • Analyze the fundamental principles of the Rankine Cycle and how steam turbines convert thermal energy into mechanical power.
  • Identify the mechanical functions and material constraints of major turbine components, including rotors, casings, and blading.
  • Execute standardized startup sequences (Cold, Warm, and Hot) while managing thermal expansion and eccentricity.
  • Master the operation of the Turbine Control System (Governor) for precise speed and load management.
  • Evaluate the critical role of auxiliary systems, such as Lube Oil, Gland Steam, and Vacuum systems, in turbine reliability.
  • Implement safe shutdown and cooldown protocols, including the strategic use of turning gears to prevent rotor bowing.
  • Identify and mitigate the root causes of turbine trips through a deep understanding of the Protection Matrix.
  • Optimize turbine efficiency by monitoring exhaust vacuum, steam quality, and extraction parameters.
  • Apply advanced preservation techniques for turbines in standby mode to prevent internal corrosion and pitting.
  • Formulate emergency response strategies for critical scenarios such as overspeed, high vibration, or loss of vacuum.

Topic

Introduction to Steam Turbine, Steam Turbine Major Components, HRSG Startup, Steam Turbine Controller, Steam Turbine Protection, Steam Turbine Shutdown.

Chat on WhatsApp